Project Name | Company Name | Project Type | Pre-Bid Date | Bid Date | Bids In |
|---|
City of Willard, OH - Celeryville Wastewater Collection System Phase 1 - Contract 2 In general, the work consists of the construction of a gravity and low pressure sewer system in Celeryville with collected wastewater pumped to the City of Willard. A collection pump station will be constructed on the south end of the project area on the west side of SR-103 and the north side of Sharpless Ditch. The pump station will be a suction lift pump station. | Jones & Henry Engineers, Ltd. (Cincinnati) | | 08/04/2026 10:30 AM ET | 08/10/2026 11:00 AM ET | 12 Days |
Village of Blanchester, OH - Reservoir 3 Improvements In general, the work consists of rebuilding the existing Reservoir 3 dam and spillway structure. The work includes, but is not limited to: demolishing and removing the existing concrete primary and overflow spillways, and reservoir drain; removing existing tree stumps and roots, and vegetation; removing topsoil and non-clayey soil; compacting existing dam soil rebuild dam to grade; construct new 24 inch drain and associated structures; construct new concrete spillway; construct new stone rip rap on reservoir side and spillway side; and finish grade seed and mulch disturbed soil and dam soil. | Jones & Henry Engineers, Ltd. (Cincinnati) | | 07/28/2026 10:00 AM ET | 08/14/2026 01:00 PM ET | 16 Days |
Village of West Unity, OH - South Liberty Pump Station Removing the existing pump station and installing a new pump station | Jones & Henry Engineers, Ltd. (Toledo) | | | 08/28/2026 02:00 PM ET | 30 Days |