Jones & Henry Plan Room: Construction Jobs for Bid

HeaderHeader
Project NameCompany NameProject TypePre-Bid DateBid DateBids In
City of Van Wert, OH - Water Treatment Spray Aeration
In general, the work consists of TTHM reduction equipment installed in an existing buried clearwell including, four mixers, four spray aerators, four ventilation blowers and the concrete structure to support the equipment; replacement of four slide gates at water supply reservoirs.
Jones & Henry Engineers, Ltd. (Cincinnati)08/25/2026 01:00 PM ET09/10/2026 11:00 AM ET
33 Days
City of Willard, OH - Celeryville Wastewater Collection System Phase 1 - Contract 2
In general, the work consists of the construction of a gravity and low pressure sewer system in Celeryville with collected wastewater pumped to the City of Willard. A collection pump station will be constructed on the south end of the project area on the west side of SR-103 and the north side of Sharpless Ditch. The pump station will be a suction lift pump station.
Jones & Henry Engineers, Ltd. (Cincinnati)08/04/2026 10:30 AM ET08/17/2026 11:00 AM ET
9 Days
Village of Blanchester, OH - Reservoir 3 Improvements
In general, the work consists of rebuilding the existing Reservoir 3 dam and spillway structure. The work includes, but is not limited to: demolishing and removing the existing concrete primary and overflow spillways, and reservoir drain; removing existing tree stumps and roots, and vegetation; removing topsoil and non-clayey soil; compacting existing dam soil rebuild dam to grade; construct new 24 inch drain and associated structures; construct new concrete spillway; construct new stone rip rap on reservoir side and spillway side; and finish grade seed and mulch disturbed soil and dam soil.
Jones & Henry Engineers, Ltd. (Cincinnati)07/28/2026 10:00 AM ET08/14/2026 01:00 PM ET
6 Days
Village of West Unity, OH - South Liberty Pump Station
Removing the existing pump station and installing a new pump station
Jones & Henry Engineers, Ltd. (Toledo)08/28/2026 02:00 PM ET
20 Days